Inland naval yard

Build the fleet. Feed it. Move it.

Readiness index46

A developed imperial base supplied through the St. Lawrence system.

1hulls plausibly launched
1vessels plausibly sustained
52weakest resource index
68seasonal work window

How to read the scale. Readiness is a comparative 0–100 teaching index, not a measured historical statistic. It combines all eight resource indices with the selected yard and season. Launching requires enough overall readiness during a workable season. Sustaining a vessel also requires the weakest resource to clear an operational threshold, with local threat reducing rather than improving capacity.

Allocation board

Every ship is a supply chain.

Allocation480 / 4800 points unassigned

Read the system

The fleet begins far from the water.

Forests, mines, foundries, ropewalks, farms, wagon roads, canals, ports, and human skill become naval power only when they meet at the yard in the correct sequence. The slowest critical input can govern the whole system.

The model uses a bottleneck-sensitive geometric mean rather than simply adding resources. That reflects the historical point: surplus timber cannot substitute for missing cannon, and a launched hull without provisions or crew is not an operational ship.

Follow the evidence

Shipyards, fleets, and inland supply

  1. The Enemy Is OursNational Park Service · naval history

    American freshwater victories and their connection to inland campaigns.

  2. Battle of Lake ErieNational Park Service · battle study

    Perry's victory and its operational consequences.

  3. British Military and Naval RecordsLibrary and Archives Canada · archive guide

    A route into service, command, unit, and naval records from the British imperial side.

  4. War of 1812Naval History and Heritage Command · naval history

    Atlantic, lake, Chesapeake, and Pacific naval operations.

  5. War of 1812 research helpLibrary and Archives Canada · archive guide

    British, colonial, militia, and Indigenous-related records.